1. Requirement from Buyer
·
Sketch
·
Size Specification
·
Fabric Detail
·
Trim & Accessories Detail
·
Testing Standard
·
Packing Instruction
·
Quantity
·
Quality
·
Delivery
2. Requirement from Sample Room
·
Consumption
·
Technical Difficulties
3. Requirement from Production & I/E
Department
·
Standard Minute Value (SMV)
·
Capacity to meet the Delivery
·
Technical Difficulties
Preliminary Costing
|
||
Sl #
|
Cost Head
|
US $
|
1
|
Fabric Cost
|
$
|
2
|
Trim and Accessories Cost
|
$
|
Material Cost
|
$
|
|
3
|
Value Added Cost (Print, Emb, Wash etc.)
|
$
|
4
|
Commercial & Logistics
|
$
|
5
|
Buying Commission if any
|
$
|
6
|
C/M ( Cut and Make)
|
$
|
Total Cost
|
$
|
|
Profit
|
$
|
|
FOB ( Free On Board)
|
$
|
|
Freight
|
$
|
|
CFR ( Cost and Freight)
|
$
|
|
Insurance
|
$
|
|
CIF ( Cost Insurance and Freight)
|
$
|